ISO 80369-20 Operating Guidance
Use this page to prepare ISO 80369 connector, product, standard and RFQ context for KingPo review.

What this resource helps prepare
KingPo supplied operating documents describe practical startup and setup steps: place the tester on a stable desktop, connect power where required, select the touch-screen function, install the sample, set time and pressure where applicable, and start the test.
This page summarizes operating guidance from KingPo supplied materials. The controlled operation document is confirmed with the selected order scope.
Fields to collect before the next step
Pressure leakage: set test time, test pressure and sample volume.
Pressure liquid leakage: connect the liquid tank valves, fill the funnel, block the sample outlet and start the test.
Subatmospheric leakage: set pressure/time/sample volume and adjust the air pressure valve.
Connector assembly: insert the reference connector hex end, hold the sample and apply force and torque.



Related products and standards
Continue from this page into the related standard, product family, requirement or test method before preparing the RFQ.
ISO 80369-20 Annex B/C Pressure and Liquid Leakage Tester
Use this page to prepare ISO 80369 connector, product, standard and RFQ context for KingPo review.
ISO 80369-20 Annex D Subatmospheric Air Leakage Tester
Use this page to prepare ISO 80369 connector, product, standard and RFQ context for KingPo review.
ISO 80369-20 Connector Assembly Device
Use this page to prepare ISO 80369 connector, product, standard and RFQ context for KingPo review.
ISO 80369-20
Use this page to prepare ISO 80369 connector, product, standard and RFQ context for KingPo review.
