Cuff system
Identify the cuff, inflation tube and instrument connection under review.
Limb cuff application pages address the connector between a cuff system and its inflation pathway, not the complete performance of a blood pressure monitor. Identify the tubing connection, DUT side, mating interface and pressure-related verification context before selecting reference components, fixtures or equipment.

Focus on the cuff or inflation-tubing connector and its pressure path, not on the performance of the complete blood-pressure monitor.
Cuff assemblies, inflation tubing and related accessories can present different connector interfaces. Show which component and connection are under evaluation.
IEC 80369-5:2016 specifies small-bore connector dimensions and functional performance for limb cuff inflation applications, including connections between a sphygmomanometer and its cuff.
The Applications page does not claim to cover complete blood pressure device performance. It helps define the connector, reference interface, fixture and pressure-related verification setup.
A useful cuff-connector review identifies the DUT side, mating component, pressure condition, sample support and the scope of the requested result.
The cuff-system connection leads to the applicable interface, reference component, pressure-related method, fixture and measurement channel.
Identify the cuff, inflation tube and instrument connection under review.
Confirm which connector half is supplied by the sample.
Select the applicable controlled interface or gauge.
Define the functional condition, fixture and measurement connection.
Agree the inspection, functional and calibration documents.
Keep connector leakage or retention questions distinct from complete-device blood-pressure measurement performance.
Confirm the physical connector pair and any gauge requirement.
Map the cuff, tubing, connector and measurement channel without treating the whole device as the test object.
Control flexible tubing and connector alignment during verification.
The connector test setup begins at the pressure pathway but remains focused on the connector interface defined by the project.
Describe how tubing, valves or accessories attach to the DUT so the fixture supports the sample without changing the connector behavior.
KingPo can review the cuff connection, mating item, pressure setup, holding arrangement and document requirement as a complete request.