Incoming Inspection
Define the connector characteristics and sampling scope checked when components or assemblies are received.
- DUT and lot
- Gauge or reference interface
- Selected functional checks
- Acceptance record
Plan incoming inspection, production checks, release testing and periodic verification with controlled gauges, reference connectors, equipment and traceable records.

Standard, interface, method, fixture, measurement and records reviewed together.
Incoming, production and release checks require defined inspection characteristics, controlled gauges or reference connectors, repeatable fixtures, equipment status and traceable records.
Separate dimensional inspection, functional checks and equipment control so each result can be traced to the correct product, reference and setup.
Define the connector characteristics and sampling scope checked when components or assemblies are received.
Use controlled fixtures and selected methods for in-process or final release verification.
Identify each gauge, its intended feature or interface, status and inspection interval.
Manage reference connectors as controlled test interfaces rather than general production parts.
Confirm that the measurement channel, fixture and calibration or verification status support the selected check.
Keep enough context to reproduce and review the inspection result.
Share the inspection stage, connector information and record expectations so KingPo can review the gauge, reference connector, fixture and equipment scope.