Product setup

Enteral Connector Fixture Kit

Fixture configuration page for aligning connector support, test method and equipment interface before quotation.

Configured to quotation requirementsAvailable for quotationConfirm calibration scope
Selection guidanceSelect product type, fixture need and certificate expectation
Figure relationshipNot applicable
Information for quotationStandard, method, quantity, fixture and certificate needs
Ordering scopeIndividual product, fixture set or documentation package
Primary useConnector validation setup
Use whenThe enteral connector test setup needs fixture or accessory support
Visual evidenceFixture/accessory selection visual and enteral reference context image are available
Selection requirementConfirm the sample drawing, reference connector and test method before selecting fixture contents
Quotation scopeConfigured product, fixture, equipment channel, calibration or documentation options
Fixture role

Use the fixture to hold, align or assemble the connector pair repeatably

  • Provide sample geometry, mating side and the direction of force or torque.
  • Confirm compatibility with the selected instrument and test method.
  • Request adapter, packing and operation notes when used in a controlled lab workflow.
Buyer next step

Send the product context, not only the product name

A useful inquiry includes the product, standard part, connector side, Figure or Annex when known, test method, quantity, fixture need, document request and calibration expectation.

Prepare RFQ

Key information

Technical valuesUse controlled datasheet or engineering record for final values
CalibrationCertificate scope discussed for the requested product scope
DownloadsDatasheet or checklist supplied when available for the selected scope
Fixture roleSupports ISO 80369-3 enteral connector setup discussion
Compatibility inputsConnector sample, mating side, fixture interface and method requirement
Documentation scopeAdapter list, setup note, controlled drawing and certificate wording requested during quotation
Asset noteCurrent public visual is a fixture-selection context asset, not a complete kit contents photograph
Product scopeSelected according to standard, Figure, connector side and documentation needs

What to confirm before ordering

Standard / FigureConfirm applicable standard and product family
Product typefixture or accessory
Connector familyfixture system family
Information for quotationMating connector, method, quantity, fixture and certificate needs
CalibrationDiscuss certificate scope and traceability needs for the requested product scope
Base configurationFixture set configurationCalibration package configuration

Share the accessory, fixture, certificate and shipping needs so KingPo can identify the right product scope.

Technical documents

Request documents for the exact product configuration

Datasheets, manuals, controlled drawings, report examples, calibration records and certificate wording should match the selected Figure, Annex, fixture, instrument channel and order configuration.

Product imageAvailable on this page
Technical drawingControlled drawing requested when applicable
DatasheetRequest for selected product scope
Request typesDatasheet request, Configuration checklist request
CalibrationCertificate scope discussed for the selected product scope
CertificateCertificate wording confirmed with quotation scope
Fixture match

Match the fixture to the sample geometry

Fixture requests should include sample drawings or photos, mating side, load or torque direction and the equipment interface.

Prepare fixture RFQ
Setup chain

Quote the fixture with the related test method

The fixture may depend on leakage, axial-load, torque, overriding or stress-cracking workflow details, so it should not be quoted as an isolated accessory.

Documents

Confirm adapters, packing and instructions

Ask for adapter lists, operating notes, packing scope and certificate wording when the fixture will be used in a controlled laboratory setup.

Request setup documents

Make the fixture inquiry specific

Provide connector photos or drawings, the required enteral reference connector, test method and equipment interface so KingPo can confirm the fixture kit contents.

Separate kit contents from setup role

Public copy describes the fixture role and request fields only. Exact adapters, packing list and controlled setup drawings should be confirmed in the quotation package.

Fixture role in the test chain

Enteral Connector Fixture Kit is not the main measurement instrument. Its role is supporting sample alignment, assembly force, holding position or equipment interface in the ISO 80369 test chain. Include the sample connector, mating side, measurement equipment and test method when requesting the fixture.

What the fixture must match

Fixture selection depends on the connector family, sample geometry, mating counterpart, direction of force or torque, and whether the laboratory needs repeated positioning or one-time engineering review. Share drawings or sample photos when the holding method is unclear.

Configuration notes

Related standards: ISO 80369-3. Related methods: falling-drop-leakage. Confirm final fixture dimensions, adapters and acceptance details with KingPo engineering for the selected sample.

Procurement value

Buying the fixture with the relevant equipment and reference connectors reduces setup mismatch risk. Request the operating instructions, certificate wording, adapter list and packing scope required by the laboratory.

RFQ context

Quote requests should include product, Figure, standard part, connector side, mating counterpart, test method, fixture need, quantity, calibration requirement and certificate expectation.

Request this product

FAQ

Is this the main measurement instrument?

Usually no. Fixtures and assembly devices support holding, alignment, assembly force or torque application around the main ISO 80369 test method.

What must the fixture match?

It must match the connector family, sample geometry, mating counterpart, load or torque direction and the equipment interface used in the test setup.

What should be provided before quotation?

Provide sample drawings or photos, connector side, intended test method, equipment channel, adapter need, quantity and documentation expectation.