Annexes I and J are informative but they are the only test procedures the draft gives for the two Clause 6 requirements. Both open with the same conditioning and environmental conditions, and both end with a prescribed list of report contents.
Annex I. Pressure decay air leakage
The connector under test is firmly mounted on the corresponding standard connector. Air is introduced at the joint and raised to the specified pressure, and the leakage rate is then measured. Before the test, samples are conditioned at 20 °C ± 5 °C and 50 % ± 10 % relative humidity for not less than 24 h; connectors made of non-hygroscopic material need not be conditioned. Testing is carried out at 15 °C to 30 °C and 25 % to 65 % relative humidity.
The apparatus list comprises the male or female connector under test, the corresponding standard connector of Annex C, an apparatus able to contain and pressurise air to the specified test pressure, a timing instrument accurate to ± 1 s, a pressure measuring instrument with accuracy not worse than 0.3 %, the additional apparatus required by test method 2, the valves and tubing connecting the test setup, and a graduated cylinder with a resolution of at least 1.0 mL (1.0 cm³). The draft recommends rigid instrument materials such as metal so that the compliance of the apparatus does not distort the result. An automated pressure decay leakage test system may replace any or all of items c) to f).
Test method 1
The connector under test is mounted on the corresponding male or female standard connector with both parts dry, and the locking mechanism is fully engaged where one is fitted. The outlet of the test connector is sealed. Air pressure is applied through the bore, the valve is closed, the test pressure is recorded and the timer is started. After a holding period the pressure and the time are recorded, the pressure change is calculated, and the leakage rate L is calculated from equation I.1. The draft defines the symbols as L, the leakage rate in Pa·cm³/s; sp, the lower limit of the specified test pressure in Pa; tp, the actual test pressure at the start in Pa; v, the volume from the valve to the test sample in cm³; Δp, the pressure change during the test in Pa; and Δt, the test period in s. The calculated rate is then compared with the acceptance value for the connector.
The worked example in the draft uses a specified pressure of 50 kPa, a gauge test pressure of 55 kPa, a total volume of 30 cm³ and a pressure drop of 350 Pa over 100 min. The formula itself is an image in the source document and is not reproduced in the extracted text, so the published standard should be consulted for the expression.
Test method 2
The same dry assembly is made, the outlet is sealed, and the mated connectors are immersed in a water bath with a water-filled graduated cylinder placed above them. Air pressure is applied, the valve is closed and the timer is started. After a 100 min wait the volume of air in the graduated cylinder is measured, divided by 100 to give a leakage volume per minute, and checked against a limit of 0.10 cm³/min.
There is a unit inconsistency in the consultation draft that a laboratory has to resolve before writing a procedure. Clause 6.1 specifies a holding time of 95 s to 100 s and a leakage rate limit of 80 Pa·cm³/s, whereas Annex I method 2 and the worked example of method 1 use a 100 min period and method 2 uses a volumetric limit of 0.10 cm³/min. Seconds and minutes are mixed between the requirement and the method, and the two acceptance figures are in different units. The published IEC 80369-5:2016 and the final GB/T text are the authorities for the values that go into a test procedure.
Test report
Eight items are required: the specific test performed under Annex I, a description of the connector under test, the number of connectors tested, the test pressure used, the acceptance criterion, the measured test pressure, the volume of the test instrument, the pressure drop over the test period, and the calculated leakage rate.
Annex J. Resistance to separation from axial load
An axial separation force is applied to the connector under test after it has been assembled with the corresponding standard connector, with any locking device engaged. The connection is expected to remain engaged. Conditioning and environmental conditions are the same as in Annex I: 20 °C ± 5 °C and 50 % ± 10 % relative humidity for at least 24 h, with an exemption for non-hygroscopic materials, and a test environment of 15 °C to 30 °C and 25 % to 65 % relative humidity.
The apparatus comprises the male or female connector under test, the corresponding standard connector of Annex C, a device for measuring the specified axial force and a timing instrument accurate to ± 1 s. The procedure has three steps: assemble the dry connectors on the standard connector with any locking device fully engaged; apply an axial force through the test fixture at about 2.5 N/s until the set value is reached and hold it for 10 s to 15 s; then inspect by eye to confirm that the connection remains engaged. The force value comes from Clause 6.2, either 2 N to 3 N or 32 N to 35 N depending on the environment of use.
Seven items are required in the report: the specific test performed under Annex J, a description of the connector under test, the number of connectors tested, the separation force used, the duration for which it was applied, the acceptance criterion, and whether separation occurred.
| Annex I, leakage | Annex J, axial separation | |
|---|---|---|
| Applied condition | 50 kPa to 55 kPa air | 2.5 N/s ramp to 2 N to 3 N or 32 N to 35 N |
| Holding period in the method | 100 min (method 2) | 10 s to 15 s |
| Acceptance in the method | 0.10 cm³/min (method 2) | connection remains engaged |
| Measurement accuracy | ± 1 s; pressure ≤ 0.3 % | ± 1 s |
| Conditioning | 20 °C ± 5 °C, 50 % ± 10 % RH, ≥ 24 h | 20 °C ± 5 °C, 50 % ± 10 % RH, ≥ 24 h |
| Report items | 8 | 7 |
Annex A on the conditioning clauses
Annex A records why I.2 and J.2 were written. Each test method contains preconditioning and environmental requirements. Hygroscopic materials absorb moisture from the surrounding gas or liquid, which can change both the dimensions and the performance of a connector, so the temperature and humidity preconditioning requirements of GB/T 1962.1 and GB/T 1962.2 were carried over for hygroscopic materials. The temperature range is the same as in those two standards. That is the reason a nylon part and a metal part are treated differently before the same test, and the reason the exemption is written for non-hygroscopic materials rather than for a product family.
The conditioning clauses also connect back to Clause 4.2 and to Annex G, where two configurations of the S1 connector were tested, one in nylon with a nominal tensile modulus of 1200 MPa and one in metal. A material change is not a documentation change in this standard; it changes the dimensional state of the sample entering the leakage and separation tests.
IEC 80369-5:2016, clause-by-clause series. Part 6 of 7.